id: req.scope-and-mvp
title: Scope and minimum viable product
kind: practice
domain: requirements
description: State what a release includes and excludes, define the minimum viable product by what it must learn, and manage every change of scope as a recorded, approved decision.
version: 1.0.0
status: approved
authority: recommended
applies_to: [core]
sources:
  - title: IREB CPRE Glossary — "Scope (of a system development)"
    url: https://cpre.ireb.org/en/downloads-and-resources/glossary
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
  - title: Karl Wiegers and Joy Beatty, "Software Requirements", 3rd edition (Microsoft Press, 2013) — scope and limitations
    url: https://www.microsoftpressstore.com/store/software-requirements-9780735679665
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
  - title: 'Eric Ries, "Minimum Viable Product: a guide" (2009)'
    url: https://www.startuplessonslearned.com/2009/08/minimum-viable-product-guide.html
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
  - title: Henrik Kniberg, "Making sense of MVP (Minimum Viable Product)" (2016)
    url: https://blog.crisp.se/2016/01/25/henrikkniberg/making-sense-of-mvp
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
  - title: Agile Alliance Glossary — "Minimum Viable Product (MVP)"
    url: https://agilealliance.org/glossary/mvp/
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
  - title: ProductPlan, "MoSCoW Prioritization"
    url: https://www.productplan.com/glossary/moscow-prioritization/
    license: LicenseRef-All-Rights-Reserved
    accessed: 2026-11-20
standards: [ISO/IEC/IEEE 29148:2018]
requires: [req.product-vision, req.requirements-specification]
related: [req.acceptance-criteria, mgmt.project-foundation]
last_reviewed: 2026-11-22
review_every: 12
---

## Summary

Scope is the line around what a release will and will not do. Writing it down, with an explicit out-of-scope
list, lets everyone say no to good ideas without a quarrel and lets changes happen in the open. A minimum viable
product (MVP) is the first release defined by what it must teach the team: the smallest complete, usable
version that tests the riskiest assumption about the users. Scope and MVP boundaries are decisions of the
person who owns the product, not of the people who build it.

## Rules

- **R1.** Every product and every release MUST have a written scope statement that lists what is in scope and
  what is out of scope. The out-of-scope list MUST name the notable things a reader might otherwise expect.
- **R2.** The scope statement MUST be kept in the requirements specification (or linked from it) and MUST
  separate what is deferred to a later release from what is a non-goal of the product.
- **R3.** Scope, the MVP boundary and priorities MUST be decided by the person who owns the product. Anyone
  else, including an AI agent, MUST NOT widen or narrow scope on their own; they MUST raise the proposal as a
  question or change request.
- **R4.** An item that is out of scope MUST NOT be built until the scope has been changed through R7.
- **R5.** An MVP MUST be defined by a stated hypothesis: who the users are, what the team believes about them
  and which evidence will confirm or refute it. The definition MUST name the scenarios (by id) that are in the
  MVP, the ones that are not, and the measure and date by which the MVP will be judged.
- **R6.** An MVP MUST deliver at least one complete path from the user's start to the user's result, with
  acceptance criteria that pass for it. A set of unfinished parts that cannot be used end to end MUST NOT be
  called an MVP.
- **R7.** A change of scope MUST be recorded as a change request that states what changes, why, and its effect
  on other requirements, schedule and cost; it MUST be approved by the person who owns the product, and the
  specification, the roadmap and the affected issues MUST be updated in the same or a linked change.
- **R8.** When the judging date of an MVP is reached, its result MUST be compared with the stated measure and
  the decision (continue, change direction or stop) MUST be recorded.
- **R9.** In-scope requirements SHOULD be prioritised for each release on an explicit scale (for example
  Must, Should, Could, Won't have this time), and the Must items SHOULD together be enough for the release
  to meet its goal.
- **R10.** A request that arrives during the work and is not in scope SHOULD be recorded in the backlog with a
  note of who asked and why, rather than being built or silently dropped.
- **R11.** The constraints that bound scope (budget, date, platform, team) SHOULD be recorded next to it.

## Guidance

- **Where scope comes from.** The vision's outcomes and non-goals give the outer boundary; the scenarios and
  requirements fill it in; the scope statement fixes what this release takes. The IREB glossary defines scope
  as the range of things that can be shaped and designed when developing a system; Wiegers and Beatty split a
  project's scope into what the first release includes, what later releases may include, and the limitations
  and exclusions.
- **Deferred or never.** "Not in this release" and "not in this product" are different statements (R2). Keep
  both lists. The second is the vision's non-goals; the first is the roadmap's later milestones.
- **What an MVP is for.** Ries defines the minimum viable product as the version that lets a team collect the
  most validated learning about customers with the least effort, and warns that it is not simply a minimal
  product. The Agile Alliance glossary repeats the definition. The test of an MVP is the question it
  answers, not the number of features it has.
- **Skateboard, not a wheel.** Kniberg's picture: a car built wheel by wheel gives the customer nothing until the
  end, while a skateboard, then a scooter, then a bicycle each work from the start. Choose the smallest thing
  that works end to end (R6), then grow it.
- **Prioritising.** MoSCoW sorts items into Must, Should, Could and Won't have this time. It works when the
  Must list is honest: if everything is Must, nothing is prioritised. Won't items are written down so that
  they are not forgotten or re-argued.
- **Working with agents.** Give an agent the scope statement and the out-of-scope list with the task. When the
  agent finds something useful outside scope, it records it as a question for the owner (R3, R10) and goes on
  with the task as scoped.
- **Small products.** A short list of "in" and "out" in the specification is enough. Do not write a scope
  document for a bug fix.
- **When not to apply.** Throw-away experiments do not need a scope statement; once their result is used by a
  product, the product does.

## Explanation

Scope creep is rarely one big decision. It is many small agreements, each reasonable, none recorded, and the sum
is a release that is late and unfocused. A written list of what is out, with an owner who alone can change it,
turns each of those agreements into a visible, priced decision.

The MVP idea applies the same discipline to learning. A product is a bundle of guesses about users; the first
release is the cheapest experiment that can test the riskiest guess. Ries's point is that the aim is learning,
not shipping less; Kniberg's is that the thing shipped must still work end to end, or the learning is spoiled
by users who cannot get through it. R5 to R8 put these two points into checks: a hypothesis, a complete path,
a measure and a date.

## Examples

Good — scope statement with a deferred list, non-goals and an MVP hypothesis:

```markdown
## Scope of release 1 (MVP)
Hypothesis: engineers will use an offline notebook for every site visit if capture takes under 10 seconds.
Measure: 20 engineers use it on 80% of visits by 2027-03-31 (judged on that date).

In: S-A Capture a note offline (FR-1…FR-4), S-B Sync when online (FR-5, FR-6).
Deferred to release 2: S-C Photos in notes; S-D Search.
Non-goals of the product: shared editing; invoicing.
```

Bad — no hypothesis, no boundary, no date:

```markdown
MVP: the basic version with the main features, to be extended as needed.
```

## Sources

- [IREB CPRE Glossary](https://cpre.ireb.org/en/downloads-and-resources/glossary) — © IREB, all rights reserved; the definition of scope is paraphrased. Accessed 2026-11-20.
- [Karl Wiegers and Joy Beatty, *Software Requirements*, 3rd edition](https://www.microsoftpressstore.com/store/software-requirements-9780735679665) — Microsoft Press, all rights reserved; scope and limitations of a project and of its releases, summarised. Accessed 2026-11-20.
- [Eric Ries, "Minimum Viable Product: a guide"](https://www.startuplessonslearned.com/2009/08/minimum-viable-product-guide.html) — all rights reserved; the definition of the MVP and its caveats, summarised. Accessed 2026-11-20.
- [Henrik Kniberg, "Making sense of MVP"](https://blog.crisp.se/2016/01/25/henrikkniberg/making-sense-of-mvp) — all rights reserved; the skateboard-to-car example, summarised. Accessed 2026-11-20.
- [Agile Alliance Glossary, "Minimum Viable Product (MVP)"](https://agilealliance.org/glossary/mvp/) — all rights reserved; the definition. Accessed 2026-11-20.
- [ProductPlan, "MoSCoW Prioritization"](https://www.productplan.com/glossary/moscow-prioritization/) — all rights reserved; the four categories, summarised. Accessed 2026-11-20.
- ISO/IEC/IEEE 29148:2018, *Systems and software engineering — Life cycle processes — Requirements engineering* — referenced by name only.