Acceptance criteria

Status
Approved
Version
1.0.0
Authority
Recommended practice
Applies to
Core
Markdown source

Summary

Acceptance criteria are the conditions a piece of work must meet for the person who asked for it to accept it. Each one is a check with a clear pass or fail, written in terms of what a user or the system does, and tied to the requirement it proves. They are agreed before the work starts, so that “done” is not argued afterwards, and they are checked by someone other than the person who built the work.

Rules

  • R1. Every requirement, and every issue or story that delivers one, MUST have at least one acceptance criterion before work on it starts.
  • R2. An acceptance criterion MUST be a statement that someone other than its author can answer with pass or fail without asking the author what was meant.
  • R3. An acceptance criterion MUST describe observable behaviour or a result (what a user or another system sees or can do), not how the work is implemented.
  • R4. Each criterion MUST carry its own stable id (for example AC-4) and the id of each requirement it proves. Ids MUST NOT be renumbered or reused.
  • R5. A criterion for a quality requirement MUST state the measured value, the condition and the method of measurement.
  • R6. For a requirement that handles input, permissions or failure, the criteria MUST include at least one case where the system refuses, rejects or fails safely, in addition to the normal case.
  • R7. Criteria MUST NOT be weakened or removed to make a failing result pass. A change to a criterion MUST be approved in the same way as a change to the requirement it proves.
  • R8. Acceptance MUST be decided by the person who owns the product or by the customer, as named in the requirements specification. The author of the work MUST NOT accept it.
  • R9. A criterion that is checked by hand MUST be written as steps with the expected result, and its result MUST be recorded with evidence (a log, a link, a screenshot) and the date.
  • R10. Acceptance MUST be recorded: each criterion with its result, the evidence, the date and who accepted. A release or a delivered work item MUST NOT be reported as accepted without this record.
  • R11. A criterion SHOULD be automated as a test where the cost is reasonable, and the test SHOULD cite the criterion id. A project SHOULD use one format for criteria, either scenarios (Given, When, Then) or a checklist (“it is done when …”).

Guidance

  • Two common formats. A scenario format reads: Given the starting situation, When an action or event occurs, Then the observable result. It comes from behaviour-driven development, where Dan North described a story’s behaviour as its acceptance criteria written as scenarios; Fowler summarises the style and its link to specification by example. The rule format is a plain checklist; the GOV.UK Service Manual suggests “it’s done when …” lines for each story. Use scenarios where inputs and outcomes vary, a checklist where the work is a set of facts to confirm.
  • Criterion, definition of done, test. An acceptance criterion belongs to one requirement or story. The definition of done is the team-wide quality bar that every item passes (reviewed, tested, documented); see templates/definition-of-done.md. A test is the automated check of a criterion or of the bar. A story is finished when its criteria are met and the definition of done is met.
  • Examples beat adjectives. “The error message is clear” fails R2. “A wrong password shows ‘Wrong email or password’ and does not say which of the two was wrong” passes.
  • Boundaries. For every number, ask “and at exactly the limit? one past it? empty? twice?” Add the cases that matter (R6).
  • Keep few and sharp. A story that needs more than a handful of criteria is usually two stories. Split it.
  • Writing them in time. Write the criteria with the owner when the requirement is written or when the item is made ready, not after the code exists. The Hub’s definition of ready asks for criteria that can be checked by a test or a demonstration (templates/definition-of-ready.md).
  • Working with agents. Give an agent the criteria with their ids and ask it to show, for each, the test or the evidence. An agent reports; the owner or customer accepts (R8).
  • When not to apply. Typo fixes and internal refactorings with no change in behaviour need no new criteria; the existing ones must still pass.

Explanation

The IREB glossary defines acceptance criteria as the criteria a work product must satisfy to be accepted by its stakeholders and, in agile development, the criteria a backlog item must satisfy. An acceptance test is a test that assesses whether a system satisfies its requirements and is typically used by customers to decide whether to accept it. That makes criteria the contract between the requirement and the proof: the requirement says what is wanted, the criterion says how everyone will know it was delivered.

Writing criteria first changes the conversation. Vague agreement (“sounds good”) becomes a question about a concrete case, while a change is still cheap. It also separates two roles that otherwise blur: the builder shows evidence, and the person who owns the outcome decides (R8). Atlassian describes the same benefits: shared understanding, less rework, and a clear point at which work is complete.

Examples

Good — scenarios tied to ids, one failure case:

- AC-7 (FR-9) Given a registered user, when they sign in with the right email and password, then they see
their dashboard.
- AC-8 (FR-9) Given a registered user, when they sign in with a wrong password five times in ten minutes,
then the sixth attempt is refused for 15 minutes and the page says when they can try again.
- AC-9 (NFR-3) The sign-in page responds in under 800 ms at the 95th percentile with 50 concurrent users,
measured by the load test `signin.k6` on staging.

Bad — not checkable, no id, describes the build:

- Sign-in works well and feels secure.
- Uses bcrypt.

Sources

  • IREB CPRE Glossary — © IREB, all rights reserved; the definitions of acceptance criteria and acceptance test are paraphrased. Accessed 2026-11-20.
  • Dan North, “Introducing BDD” — all rights reserved; the scenario form (Given, When, Then) and the idea that a story’s behaviour is its acceptance criteria, summarised. Accessed 2026-11-20.
  • Martin Fowler, “Given When Then” — all rights reserved; the style and its origin, summarised. Accessed 2026-11-20.
  • GOV.UK Service Manual, “Writing user stories” — Open Government Licence v3.0; acceptance criteria as an “it’s done when” checklist. Accessed 2026-11-20.
  • Atlassian, “What is acceptance criteria?” — all rights reserved; purpose and benefits, summarised. Accessed 2026-11-20.
  • ISO/IEC/IEEE 29148:2018, Systems and software engineering — Life cycle processes — Requirements engineering — referenced by name only.