Release checklist

Used in the playbook Quality and release.

Download release-checklist.md — the source, as in the repository.

How to use

The template's own instructions:

UASK Engineering Hub template · release-checklist 0.1.0 · playbook quality.quality-release (R9–R23) · CC BY 4.0 Copy once per release, for example to releases/vX.Y.Z.md, or paste into the release pull request. Fill it in BEFORE deploying (sections 1–6), then during and after (7–9). Keep it as the release record (R21). Hotfix lane: steps marked [hotfix: shortened] may be shortened for a hotfix (R22); all other steps are never skipped. Operating systems: also fill in the SCF release record (scf.release-record-template). Delete these comments in the copy.

Fields

Front-matter fields and sections of the document the template creates. A section marked Optional in the template may be deleted from a copy; every other field and section stays (tools/check_artifacts.py checks this for the kinds it knows).

Field or sectionWhereRequired
1. Scopesectionrequired
2. Readinesssectionrequired
3. Deploy plansectionrequired
4. Backup (before deploy)sectionrequired
5. Rollback plansectionrequired
6. Approvalsectionrequired
7. Deploy logsectionrequired
8. Post-release verificationsectionrequired
9. Outcomesectionrequired

Example

A filled-in copy for an invented product, templates/examples/release-checklist.md, in the Hub repository.It shows the level of detail to aim for, not text to reuse.

example-release-checklist.md
# Release v1.1.0 — Fieldnotes
Type: regular · Prepared by: the lead agent · Approver: Alex Doe · Planned window: 2026-07-06 10:00–10:30 UTC
## 1. Scope
- Version: `v1.1.0` (previous: `v1.0.0`), class: MINOR — why: new export screen, nothing removed
- Changelog entry: CHANGELOG.md, section `[1.1.0]`
- Breaking changes and upgrade steps: none
- Stored data changes (migrations, imports, settings): none — reversible? yes
## 2. Readiness
- [x] Main is green at commit `4f2a9c1`; the tag will point to it.
- [x] Artefacts built by CI from the tag (job 812); checksums recorded below.
- [x] Staging verification done; results: all critical paths pass on the test channel.
- [x] Acceptance by owner or users: Alex Doe, 2026-07-03.
- [x] Dependency audit run (`npm audit --omit=dev`); no known exploited vulnerabilities.
- [x] Documentation and changelog updated.
| Artefact | SHA-256 |
|---|---|
| `fieldnotes-1.1.0.apk` | `9b1c…e07a` |
## 3. Deploy plan
- Window: 10:00–10:30 UTC — chosen from: store statistics, lowest weekday activity.
- Who deploys: the lead agent · who can roll back during the window: Alex Doe
- Steps:
1. none — no maintenance mode
2. promote the build from the test channel to production
3. no migrations
4. none
- Expected duration: 10 minutes · Users informed: release notes in the store
## 4. Backup (before deploy)
- What: not applicable, the app stores nothing on a server
- Where: — · Taken at: — · Size checked: —
- Restore command or procedure: the previous package stays in the store history
## 5. Rollback plan
- Triggers — roll back if any is true during verification:
- a critical path fails
- the crash rate is above 1 % for 30 minutes
- Steps: promote the `v1.0.0` build again; no data change to undo.
- Expected time: 10 minutes · Decides: Alex Doe
## 6. Approval
- [x] Approved against this checklist by Alex Doe on 2026-07-06 09:50. A green pipeline alone is not approval.
## 7. Deploy log
- Started: 10:02 · Finished: 10:09
- Deviations from the plan: none
## 8. Post-release verification
| Critical path (from the test strategy) | Result |
|---|---|
| write a note in flight mode, kill the app, reopen | pass |
| sync two devices | pass |
- [x] Error logs read: none
- [x] Monitoring watched for 2 hours: no crash above baseline
## 9. Outcome
- Result: verified
- Follow-up issues: none · Regression tests added: none
- Record kept at: this file

Completion checks

A copy is complete when:

  • every required field and section above is present, in the same order, and no bracketed placeholder is left;
  • the template's comments are deleted from the copy;
  • the exit criteria of its stage of the playbook Quality and release are met;
  • the owner has approved it, where the playbook asks for approval. Only the owner sets approved.

Source

templates/release-checklist.md, as in the repository. Placeholders are in square brackets; comments carry the instructions.

release-checklist.md
<!--
UASK Engineering Hub template · release-checklist 0.1.0 · playbook quality.quality-release (R9–R23) · CC BY 4.0
Copy once per release, for example to releases/vX.Y.Z.md, or paste into the release pull request.
Fill it in BEFORE deploying (sections 1–6), then during and after (7–9). Keep it as the release record (R21).
Hotfix lane: steps marked [hotfix: shortened] may be shortened for a hotfix (R22); all other steps are never
skipped. Operating systems: also fill in the SCF release record (scf.release-record-template).
Delete these comments in the copy.
-->
# Release vX.Y.Z — [project]
Type: regular / hotfix · Prepared by: [name or agent] · Approver: [name] · Planned window: [YYYY-MM-DD HH:MM–HH:MM TZ]
## 1. Scope
- Version: `vX.Y.Z` (previous: `vA.B.C`), class: MAJOR / MINOR / PATCH — why: [one line]
- Changelog entry: [link to the CHANGELOG.md section] [hotfix: shortened — one line is enough]
- Breaking changes and upgrade steps: [none / list]
- Stored data changes (migrations, imports, settings): [none / list] — reversible? [yes / no]
## 2. Readiness
- [ ] Main is green at commit `<sha>`; the tag will point to it.
- [ ] Artefacts built by CI from the tag (`<job link>`); checksums recorded below.
- [ ] Staging verification done; results: [link or summary]. [hotfix: shortened — affected path plus critical paths]
- [ ] Acceptance by owner or users: [who, when]. [hotfix: shortened — owner confirms the fix]
- [ ] Dependency audit run (`<command>`); no known exploited vulnerabilities, or exception: [link].
- [ ] Documentation and changelog updated.
| Artefact | SHA-256 |
|---|---|
| `<file>` | `<checksum>` |
## 3. Deploy plan
- Window: [time] — chosen from: [traffic or load data]. [hotfix: shortened — as soon as approved]
- Who deploys: [name or agent] · who can roll back during the window: [name]
- Steps:
1. [maintenance mode, if any]
2. [deploy command or procedure]
3. [migrations, cache clear]
4. [leave maintenance mode]
- Expected duration: [minutes] · Users informed: [how, if needed]
## 4. Backup (before deploy)
- What: [files / database / configuration]
- Where: [location] · Taken at: [time] · Size checked: [size, compared with previous]
- Restore command or procedure: [how]
## 5. Rollback plan
- Triggers — roll back if any is true during verification:
- [for example: a critical path fails]
- [for example: error rate above X % for Y minutes; any fatal error in the log]
- Steps: [redeploy vA.B.C artefact; restore data from section 4 if the data change is not reversible]
- Expected time: [minutes] · Decides: [approver]
## 6. Approval
- [ ] Approved against this checklist by [name] on [YYYY-MM-DD HH:MM]. A green pipeline alone is not approval.
## 7. Deploy log
- Started: [time] · Finished: [time]
- Deviations from the plan: [none / list]
## 8. Post-release verification
| Critical path (from the test strategy) | Result |
|---|---|
| [path] | pass / fail |
- [ ] Error logs read: [findings]
- [ ] Monitoring watched for [observation period]: [findings]
## 9. Outcome
- Result: verified / rolled back / fixed forward by hotfix `<version>`
- Follow-up issues: [links] · Regression tests added: [links]
- Hotfix only: fix landed on main in [pull request link].
- Record kept at: [this file / release page]